Baghdad railway line railway station which was built as the starting station.
Of the period of Ottoman Sultan
II. In the period
On May 30
Started on 1906.
Opened in 1908. To the building site
III. Selim Pasha, named after Heydar coverings. Binanı construction, Anatolia, Baghdad, carried out under the name of a German company. In addition, the breakwater in front of a German attempt to build the station wagons were coming or going from Anatolia commercial facilities has been able to load and unload luggage. Two
German architects Otto Ritter and Helmuth Conui the project came into force. Çalmışmış with the German masters of the masters of Italian stone. During the First World War, the ammunition depot station
A sabotage in 1917 as a result of the fire damaged a large part of the building. Re-restored building took its present form. In 1979, a tanker ship from the Haydarpaşa Independente collision off the heat and because of the explosion damaged the building's stained-glass windows that lead Linneman from his master. In fact, repaired in accordance with the re-building,
Restored in 1976, a wide range of
Four exterior façade restoration was completed at the end of 1983 the two towers.
In this article, on the plan that covers the entire area, not just on the topic I want to render the station building.
The first project designed in the 1980s and was heard on Haydarpasa Train Station. According to this project Sogutlucesme Station Train Station to be moved, to be inserted into the state of Haydarpasa Train Station commuter station, the station building was called to the hotel. They would have under the European side of the tunnel which will take place Söğütlüçeşme trains. This issue not on the agenda for a long time, totally forgotten by the public. However, the issue, in a different way than in the 2000s, the Marmaray Project name came up again. İbrahimağa'dan tunnel will pass this time but most importantly from the European Side railway station and the harbor area will be opened to construction.
In this article, on the plan that covers the entire area, not just on the topic I want to render the station building.
On November 10, 2010 garda repair restoration work within the ITU Technocity TehnoBee made a contract with the Company obtained. 18 days after concluding this contract on November 28, 2010 there was a fire on the roof of the station building and the building's upper floors became uninhabitable condition. On top of that to repair the roof of the building along with the project and the survey has been realized in the absence of - restütisyon - restoration (3R) projects, it was necessary to obtain.
Haydarpasa on 01/16/2011 at Mimar Sinan University Conference Hall of Loyalty to the SOS Haydarpaşa Panel speaking for the first time the authorities "should be given new functions Gara, hotel rooftop café on the lower floors, which can be also benefit the people" used phrases such as. On 02/08/2011 TCDD, Technobee Academic Agency Science Advisory Board appointed by the Presidency of the firm within the ITU, ITU Maslak Campus Suleyman Demirel Cultural Center carried out a briefing to members of NGOs, and the media. At this meeting will change the function of the building described in more specific terms, those who come. However, it is understood that this meeting will be in effect established the Advisory Committee in the preparation of building projects in 3R.
Since its beginning in 1908 until the station building is no longer used at all times trencilerin trencilere be left only the ground floor, the upper floors of the hotel, culture, tourism is considered as a way to serve new functions. There is a cafe-restaurant on the roof of the sea and enjoy the views of people seyretmelerinin improvement project will be supplied.
3R projects, the creation of the advisory board that there is no procedure for obtaining known. Preparation of the projects would be to give the job to one of the well-proven project offices. 3R projects at every stage of this project prepared by Bureau of Culture Heritage Conservation District Board (KVKBK) shall be approved by the examining. Then, based on the license municipality is carried out restoration application. Here, an unusual set up an advisory committee. Therefore, the router will be the preparation of the advisory board remains as to 3R projects. So the building itself functions will be placed away from the main function, is certain